DURAVIT WD1022 000 090 Notice De Montage page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6
7
> Position carrier in the prepared
opening.
> Carrier face plate must be flush
with the front of the surrounding
studs to accomplish maximum
support for the wall sheeting
(applied later).
9
2x 8,4
> Set carrier back in place and install
anchor bolts on the base first.
8
7
> With the carrier in place, mark all
anchor and bolt hole locations onto
studs of wood frame.
10
2x 8x70
> With anchor bolts set, ensure
carrier is flush to stud frame.
> Adjust as needed before installing
side stud bolts.
8
ø ⅜"
ø ⅜"
ø ¼"
> Remove carrier from wodden
frame.
> Drill out 4 marked ⅜" pilot holes in
the studs.
> Drill out 2 marked ¼" anchor holes
in the frame base.
11
4x M8
4x 8,4
> With carrier set in place, secure
carrier to studs by installing 4 stud
bolts in marked locations.
70300131_Mounting_Wall carrier_standard
4x M8x70
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Wd1022 000 091

Table des Matières