Wiring; Connecting Busbars - Lenze L-force 9400 Série Instructions De Montage

Masquer les pouces Voir aussi pour L-force 9400 Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5
Electrical installation

Wiring

Connecting busbars

5.3
Wiring
5.3.1
Connecting busbars
Fig. 5−2
Example: Connecting busbars
Proceed as follows to connect the busbars:
1. If devices of the interconnected system have already been in operation:
If necessary, switch off the supply system and wait until the discharge
time has elapsed (depending on the device, this may take up to 30
minutes).
Make sure that all power terminals are deenergised.
52
l
SSP94PN201
EDK94ZPM113 DE/EN/FR/ES/IT 6.0

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

E94azpm série

Table des Matières