• All inlet and apertures should be sealed to prevent any
cause serious scald or damage the steam room.
1. SELECTING THE PROPER STEAM GENERATOR:
In order to achieve comfort and relaxation, as well as energy
and size are as critical as design of the steam room itself. The
to match the parameters of the generator.
Please referring to technical sheet and select the suitable model
2. INSTALLATION OF STEAM GENERATOR
whether you have the correct model for your steam room
according to technical sheet.
• A manual resetting 120°C temperature control switch is
installed in the steam generator for over-heat protection. If
switch will automatically disconnect power supply to heating
element. In this case, it is necessary to disconnect the
heating elements, relay on sub-board and water supply
pipeline after steam generator completely cool down. The
temperature switch could only be manually reset after the
fault has been located and solved. The temperature control
freezing, or corrosive place. Do not install the generator
alert to the steam pipeline and safety valve since the high
temperature of steam is dangerous to customers.
• Generator must be level installed.
• The generator should be installed in a dry and well-
ventilated place. It can be installed either on the wall or on
steam room as close as possible or in the basement.
Install
in the roof
installed in
a technical
unit
Install in the basement
• Install the generator on the wall: drill two small holes with
diameter of 8mm on the wall, insert the expansion screws
and then hang the generator on those screws.
on the site and then screw the generator into the frame.
• For better service and maintenance, please install the
generator with the nameplate face to front and leave more
than 250mm space around the generator.
3. INSTALLATION OF CONTROLLER AND TEMPERATURE
SENSOR
DISPLAY:
The controller should be installed with height of 1.2 m outside
the steam room but nearby or other place where easy to operate.
BEFORE TILING INSTALLATION OF BUILT-IN BOX FOR
DISPLAY
conduit
control wire
connector
WALL
AFTER TILING INSTALLATION OF BUILT-IN BOX FOR
DISPLAY
conduit
control wire
connector
WALL
Pull the control wire and temperature sensor wire through
connector (4-Pin). Finally the controller panel can be glued to
21
EN
Apply
silicone here
DISPLAY
TILES
Apply
silicone here
DISPLAY
TILES