9-5-1. Removing the pinched connecting pipes
The unit is shipped with the pinched connecting pipes attached to the high- and low-pressure side service valves to prevent gas leakage.
Take the following steps ① through ③ to remove the pinched connecting pipes before connecting refrigerant pipes to the outdoor unit.
① Check that the service valves are fully closed (turned clockwise all the way).
② Remove the gas in the pinched connecting pipes, and drain out all the refrigerant oil. (See Ⓔ below.)
③ Remove the pinched connecting pipes. (See Ⓕ below.)
<A>
<B>

9-5-2. Connecting pipes

・The refrigerant pipe from the outdoor unit is branched at the pipe end, and each branch is then connected to an indoor unit.
Indoor unit
High-pressure pipe
Outdoor unit
Low-pressure pipe
Branched section
・When connecting pipes, make sure the service valves are completely closed.
・Commercially available pipes often contain dust or debris. Always blow them clean with a dry inert gas.
・Take care to prevent dust, water or other contaminants from entering the pipes during installation.
・Reduce the number of bending portions as much as possible, and make the bending radius as big as possible.
・Do not use any commercially available anti-oxidizing agents since they may cause pipe corrosion and degrading of the refrigerant oil. Please
contact Mitsubishi Electric for more details.
・Make sure that the pipes are not in contact with each other, unit panels, or base plates.
・Refer to the twinning kit Installation Manual for how to install the twinning kit.
<Refrigerant piping connection examples>
・Obtain joints and elbows on site as necessary according to the pipe diameter, and connect the pipes as shown in the figures below.
(1) When routing the pipes through the front of the unit
WT09112X02
<A> Refrigerant service valve (high-pressure/brazed)
<B> Refrigerant service valve (low-pressure/brazed)
Valve shaft
The unit is shipped with the valve closed. Keep the valve closed while connecting pipes or
evacuating the system. Open the valve upon completion of this work.
close it.
Stopper pin
Service port
Through the service ports, you can charge refrigerant, remove the gas in the pinched
connecting pipes, or evacuate the system.
Cap
Remove the cap before turning the shaft. Put the cap back on upon completion of all work.
Severed section of the pinched connecting pipe
Brazed section of the pinched connecting pipe
Connecting method
Brazed or flared
Brazed
Brazed
Brazed