Télécharger Imprimer la page

marklin Start up Farming Train Notice D'utilisation page 11

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 15
6.2 Switched Mode Power Pack •
IR Controller • Base Station
1 – Switched mode power pack
2 – Feeder wires
3 – Base station with socket
4 – Lens
Base Station
6.3 Connections for the Base Station
Important Information:
!
The connections for the Base Station may
only be made to the switched mode power
pack included with this starter set. Other switched
mode power packs or transformers may not be
used!
The Base Station requires the power pack as a
source of power. Therefore, only the power pack
(1) with the cable (2) may be plugged into the
socket on the Base Station (3).
6.4 IR Controller
4 – Lens
5 – Function buttons
6 – Speed controller
7 – Changing direction / Train stop
8 – Light button
9 – Address selector switch
2
1
+
0
-
STOP
6.5 Operating the IR Control for the First Time
Before operating this controller for the first time,
2 type AAA batteries must be installed in the con-
troller. Please see the following illustration.
Unscrew the battery holder and lift up the cover.
Install 2 type AAA (micro size) batteries as shown
in the drawing.
!
Insert or change batteries only in pairs!
Pay attention to polarity!
3
4
+
0
-
11

Publicité

Chapitres

loading

Ce manuel est également adapté pour:

29652