Assembling The Bottom Rails - Trigano Jardin OSMOSE Ovale Notice De Montage Et Guide D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
Very carefully check the spacing between all the posts (side S in chapter 7.1) and that they are positioned vertically.
The levels between each of them must also be checked.
After alignment completion, ensure that the diagonals are equal.
Once the wedging is completed, fill the trenches with a bit of sand.
Then proceed with assembling the pressure plates before covering them with sand:

10. Assembling the bottom rails

If the pool is not installed on a concrete slab, place a concrete slab of around 30 x 30 x 5 cm at each connecting point of the
bottom rails (rounded parts of the pool). These slabs must be placed in such a way that their surface arrives exactly at ground
level.
WARNING: The connecting plate must lie totally flat against the entire length of the concrete slab. The absence of a
concrete slab or using one that is too short may result in an inadequate installation and could lead to the collapse of the
pool.
Before assembling the bottom rails of the rounded parts of the pool, place the metal sheet wall inside the enclosure of the pool.
1212 or 1615 or 1618
Metal rail
OSMOSE Oval
YES
6254
Pressure plate
Sand
NO
0341
Metal sheet screws
1212 or 1615
Metal rail
Support leg assembled
Slab 30 x 30 x 5
cm
100
Pool interior
Pool exterior
2276
Connecting plate
In the rounded parts, slide the
rails into the connecting plates
leaving a space of around 1 cm
between the rails in the centre of
the connecting plate.
Assembly Guide 880115-rev A