Télécharger Imprimer la page

Gb Starting Locomotive Operation; Maintenance Of The Model - Roco 52 Série Mode D'emploi

Publicité

GB
Starting locomotive operation
Unwrap model: Take the loco carefully out of
the packing with the help of the foil (fig. 1).
Very important!
Before taking into service your model these
bearings of the coupling rods must be oiled as
otherwise there would be the risk of bad run-
ning qualities of dramage on he locomotive (see
fig. 9).
Operating instructions: Before use is advisab-
le to let the loco go around about 30 minutes for-
wards an 30 minutes backwards without load, to
obtain an optomal circuit and best tractive power.
The smallest radius this model should run is R3
(419,6 mm) or rather R2 (358 mm) of the ROCO
track system (model without tubes protection pis-
tons would run only if driven very carefully on R2)
(fig. 3).
More information about the sound decoder can be found here
14
Your locomotive will run smoothly on clean tracks
only. For this purpose we recommend using item
no. 46400, ROCO track cleaning van, or item
no. 10002, ROCO track cleaning rubber, for
removing heavy dirt.
Fittings: Operation is possible with different
couplings (fig. 2). We recommend using the ROCO
close coupling.
In the enclosed accessory bag you will find small
kits to be fitted on your locomotive. Please mount
them cautiously. Attention! Use glue only if
indicated (fig. 2).
Running in digital mode:
First remove Tender body (fig. 8). Then remove the
jumper from the interface. Finally put the plug of
the chip into the interface as shown in fig. 4.
A.C. operation: see fig. 13
GB

Maintenance of the model

To enjoy your model for a long time, it is neces-
ary to service it regulary (i.e. after it has been in
operation for approximately 30 hours). Uncouple
locomotive and tender first (fig. 6).
1. Cleaning of wheel contacts: Wheel cont-
acts easily get dirty on tracks which are not enti-
rely clean. Use a small brush to remove dirt from
spots marked in fig. 11.
2. Lubrication: Apply tiny oil drops to spots
marked in fig. 9. Prior to lubrication dismantle the
loco body or the tender body (fig. 7, fig. 8). We re-
commend using item no. 10906, Roco oiler. For
lubrication the gearparts (e.g. cogwheels, worm)
we would recommended our Roco special grea-
se (item no. 10905).
Attention: Please do not oil these parts when
using our grease.
3. Change of lights: First remove loco body and
the tender body (fig. 7, fig. 8) and then change
lights (fig. 9, fig. 8).
4. Steam generator application (fig. 5): First
remove the loco body (fig. 7) and then push in the
Seuthe steam generator no. 10 (running in digital
mode: use no.11).
5. Change of traction tyre: Remove bogie
blind. Take out the wheel set and remove the
traction tyre using a pin or a fine screwdriver
(fig. 12). When pressing on the new traction tyre
please avoid twisting it.
6. Carbon Brush Changing: First remove ten-
der body (fig. 8), and then the motor (fig. 8).
Assembly: During assembly please take care of
correct position of contacts (fig. 8).
3

Publicité

loading

Ce manuel est également adapté pour:

722287222978229