Télécharger Imprimer la page

VelLight LEDC10 Mode D'emploi page 4

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 15
4.
Installation and wiring
 First connect the load wire, then the power wire.
 Make sure short circuit cannot occur between connecting wire
before you turn on the power.
 The supply voltage of the controller ranges between
DC12V~DC24V. Using other voltages will damage the controller.
Step 1 - Open the touch panel
 As shown, gently open the touch panel (for example with a small
screwdriver).
Step 2 – Disconnect the connector cable
 Open the connector and gently remove the connector cable.
Step 3 - Choose a wiring method
Connect the wires according to the mode you will use (see section
Wiring below).
Step 4 - Attach the controller on the wall
Attach and screw the controller to the wall as shown in the picture.
The distance between the screws is 60mm.
V. 01 – 28/03/2013
LEDC10
4
©Velleman nv

Publicité

loading