Télécharger Imprimer la page

Gallagher S10 Notice D'installation page 10

Masquer les pouces Voir aussi pour S10:

Publicité

Les langues disponibles

Les langues disponibles

IMPORTANT BATTERY INFORMATION
Recharging the ba ery
Storing the energizer
Maintenance free ba ery
Ba ery replacement
Removing the ba ery
Disposing the energizer
Disposing the ba ery
PRODUCT SPECIFICATIONS
Ba ery
Current draw
Stored energy
Output energy
Output voltage (no load)
10
Switch the energizer off . Place in sunlight for 3 days
with the ba ery connected OR remove the ba ery
from the energizer and charge the ba ery for 24
hours with a 6 V 1.2 A ba ery charger.
Switch the energizer off . Store in a well lit area so
solar panel keeps ba ery charged. Recharge ba ery
before and a er storage.
The ba ery must not be opened and does not
require maintenance.
Use only 6 V 4 Ah sealed, valve regulated (VRLA)
ba eries.
Switch the energizer off before removing the ba ery.
The ba ery must be removed from the energizer
before the energizer is disposed.
Lead acid ba eries must be disposed of safely
according to local regula ons.
6 V 4 Ah sealed lead acid (2M1847)
15 mA
0.1 J
0.07 J
7 kV

Publicité

loading