Commissioning The Unit - Daikin Altherma C Gas W EHOB12AAV1 H Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 108
6.2

Commissioning the unit

Reading
1
On/off
2
CH operation or setting maximum CH temperature
3
Tap operation or setting tap temperature
4
Required temperature CH or tap water in °C / pressure CH water in bar / malfunction code
5
Tap comfort function eco (n/a for EHOB*A*V1H units)
6
Tap comfort function on (n/a for EHOB*A*V1H units)
7
Operating code
8
Blinking in case of a malfunction
After the following actions have been completed, the unit may be commissioned.
1.
Press the
button to commission the unit.
The heat exchanger will be heated up, and on the service
and/or OpenTherm regulation).
2.
Set the pump setting depending on the set maximum power and the water side resistance of the installation. For the water head of the
pump and the loss of pressure of the unit: (see par. 7.5).
3.
Set the room thermostat higher than the room temperature. The unit will now go into CH operation:
4.
Fire up the installation.
5.
Check the temperature difference between the input and return of the unit and the radiators.
This should be approximately 20°C. Set the maximum power on the service panel for this purpose (see par. 7.3). If necessary, set the
pump setting and/or radiator shut-off valves. The standard setting of the pump is setting 3. The minimum feed-through amounts to:
155 l/h at a set power of 5.4 kW
510 l/h at a set power of 17.8 kW
750 l/h at a set power of 26.2 kW
1150 l/h at a set power of 40.9 kW
6.
Switch the unit off.
7.
Purge the air from the unit and the installation after cooling down (top up if necessary).
8.
Check the heating and the hot water provision for the correct functioning.
9.
Instruct the user on the filling, air purging and functioning of the heating and the hot water provision.
Comments
The unit is fitted with an electronic boiler controller which ignites the burner relay and
continuously monitors the flame, at every heat request from the heating or from the
hot water provision.
The circulation pump will run at every heat request for the heating. The pump has a
post-running time of 1 minute. The post-running time can be changed upon request
(see par. 7.3).
The pump will run automatically 1 time per 24 hours, for 10 seconds, in order to
prevent it from getting stuck. This automatic switching on of the pump takes place 24
hours after the last heating request. To change the time, the room thermostat must
be turned up for a moment at the requested time.
For the hot water provision, the pump will not run.
Daikin Europe NV
Operating
A
On/off button
B
Tap/CH button to set the required temperature
C
- button
D
+ button
E
Tap comfort function off / eco / on (n/a for EHOB*A*V1H units)
F
Service button / actual temperature during heat request
G
Reset button
3.
4
7
display,
,
and
appear (Depending on status of external eco switch
5
on the service
display.