Connecting; Connecting Ch Installation - Daikin EHOB12AAV1H Instructions D'installation

Masquer les pouces Voir aussi pour EHOB12AAV1H:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 105
5

CONNECTING

5.1

Connecting CH installation

1.
Rinse the CH installation carefully.
2.
Fit the supply pipe (A) and return pipe (B) to the connection set.
3.
All pipes must be assembled with no electrical current, in order to prevent shocks
from the pipes.
4.
Existing connections may not be rotated, in order to prevent leakages.
The CH installation must be fitted with:
A filling/draining tap (A) in the return pipe, immediately underneath the unit.
A draining tap at the lowest point of the installation.
An overflow valve (B) of 3 bar in the input pipe at a distance of no more than 500
mm from the unit.
Between the unit and the overflow valve there may be no valve or constriction.
An expansion vessel in the return pipe (in the B-pack or in the installation).
A check valve, if there are pipes running up, within close distance of the unit. This
prevents a thermosiphon effect from occurring during tap water operation (a non
spring-operated return valve, must be assembled vertically).
5.1.1
Thermostatic radiator taps
If all radiators are fitted with thermostatic or cable radiator taps, a minimum water
circulation must be safeguarded. See par. 7.5.
Daikin Europe NV
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ehob18aav1hEhob42aav1h

Table des Matières