Télécharger Imprimer la page

Fantech DBF4XLT-705 Manuel D'installation Et D'opération page 6

Publicité

Les langues disponibles

Les langues disponibles

6
Pressure Switch Positioning
Correct Switch Positioning - Diaphragm Positioned Vertically
Horizontal Duct
Correct Control Positioning
Incorrect Control Positioning
Dimensional Data
2.00
9.69"
4.00"
Dimensions in inches.
Tubing
Tubing
1/2" Mark on Tubing
1/2" Mark on Tubing
Duct Wall
Duct Wall
fantech
Angled Duct
Correct Control
Positioning
Incorrect
Control
Positioning
ACCESS DUCTS
MUST BE REMOVABLE
FOR LINT CLEANOUT
10.00
FC4 CLAMP
SLIDE FC4 CLAMPS OVER
.03" to .06"
DUCT ENDS & TIGHTEN
DO NOT OVERLAP
SCREWS UNTIL DUCT
28.56"
LENGTH OF THE UNIT WHEN ASSEMBLED
DURING INSTALLATION ALLOW ENOUGH
CLEARANCE FOR REMOVAL OF ACCESS DUCTS
Grommet
Grommet
1/4" Max.
1/4" Max.
Wiring Diagram
LEAVE .03" TO .06"
CLEARANCE FOR
MATING DUCT ON
BOTH ENDS
120VAC
HOT
SUPPLY
POWER
NEUTRAL
4.00
DIA NOMINAL
IS SECURE
Step 6. Installing grommet and Tubing
Do not connect tubing in such a manner as to allow
condensation from the duct to collect in the tubing.
First, drill a 3/8 inch to 7/16 inch diameter hole in
the duct wall. Carefully insert the grommet into the
hole. (Drilling a metal duct may produce burrs. Be
careful not to be cut or pricked by the burrs or the
duct.) Next, force one end of the tubing over the
nipple on the control. Make a mark a distance of 1/2
inch from the other end of the tubing. Slide this end
of the tubing through the center of the grommet up
to the mark as illustrated.
Vertical Duct
Control Correct
in all Positions
FAN CAP
FAN OUTPUT
TOP
FAN NEUTRAL
HALL"+"
HALL SIGNAL
HALL"-"
R
M
I TH1 TH2 N1 N2 H1 H2 H3
1
2
3
4
5
6
7
8
9
1 0
+5V
RB
121K

Publicité

loading

Ce manuel est également adapté pour:

483443