Building-In; Technical Specifications - ETNA A833 Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Building-in

1. Make the cut-out in the work surface. Ensure
that there is sufficient space allowed at the
sides and at the back.
560
490
Please note:
The distance between the hob and the rear
wall must be at least 40 mm.
2. Make a hole in the side of the kitchen cabinet
to enable the gas pipe to be passed through.
3. Stick the strips of sealant to the underside of
the hob.
4. Screw the 4 clamps under the appliance.
5. Place the appliance in the cut-out.
6. Secure the appliance in position.
7. Make the gas connection. Check the gas
connections with a soap/water mixture
(see "Gas Connection").
8. Test to check the appliance is operational.
The building in of the hob in combination with a
fig. 4
built-in oven is described in the installation guide
for the oven.
Attention!
The underside of this built-in hob becomes
hot. Take care that you do not place any
flammable or plastic objects in any drawer
under the appliance.
fig. 5

Technical specifications

Type of hob
Gas:
Connection G3/8"
Dimensions (appliance):
580x67x510 wxhxd in mm
Dimensions (recess):
560x490 wxd in mm
fig. 6
(also see table on cover)
A833H

Publicité

Table des Matières
loading

Table des Matières