Télécharger Imprimer la page

Ecoflam MAX GAS 40 P CV Mode D'emploi page 10

Masquer les pouces Voir aussi pour MAX GAS 40 P CV:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26
EN
A
A1
Gas lines
When installing the gas lines and gas train,
the general EN676 directives and
guidelines must be observed.
EN676 compulsory kit and accessories in
order to comply to the safety regulations.
Additional accessories and kits shall be
installed by the installer in accordance to
the local safety regulations and codes of
practise.
10
www.ecoflam-burners.com
5
4
3
LEGENDA
Pf: Back pressure of furnace
Pb: Pressure of burner (combustion head
+ complete gas train)
Pin: Minimum inlet pressure
Burner blast tube insertion depth and
brickwork
Unless otherwise specified by the boiler
manufacturer, heat generators without a
cooled front wall require brickwork or
insulation 5 as shown in the illustration.
The brickwork must not protrude beyond
the leading edge of the blast tube, and
should have a minimum conical angle of
60°. Gap 6 must be filled with an elastic,
non-combustible insulation material. For
boilers with reverse firing, the minimum
burner tube insertion depth A as speci fied
in the boiler manufacturer's instructions
must be observed.
On boilers the blast tube insertion depth
should be observed as per the boiler
manufacturer's instructions.
Reverse flame boiler :
A = 50-100 mm.
Three pass boilers :
A1 = 50-100 mm.
Exhaust system
To avoid unfavourable noise emissions,
right-angled connectors should not be
used on the flue gas side of the boiler.
LPG TRANSFORMATION
KITLPG-MAXGAS...
For operation with Lique fied Petroleum
Gas, it is necessary to order the kit and
follow the instructions given in the
specific manual.
420010573700

Publicité

loading

Ce manuel est également adapté pour:

Max gas 70 p cvMax gas 105 p cvMax gas 120 p cv