ALL OPERATIONS DESCRIBED IN THIS SECTION MUST BE CARRIED OUT BY QUALIFIED PERSONNEL
ONLY.
The company assumes no responsibility for any damage caused by flawed connections or by operations
that are not described in this manual.
S
UPS
TORAGE OF THE
P
REPARATION FOR INSTALLATION

PRELIMINARY INFORMATION

UPS Models
Nominal power
Operating temperature
Max. relative humidity during operation
Max. installation height
Dimensions W x D x H
Weight with no batteries
Weight with batteries
Dissipated power with nominal resistive load
(pf=0.9) and buffer battery
Dissipated power with nominal distorting load
(pf=0.7) and charged battery
Flow rate of the fans to remove heat from the
(2)
installation area
Current dispersion to earth
Protection level
Cable input
(1) 3,97 B.T.U./h = 1 kcal/h
(2) The following formula can be used to calculate the air flow rate: Q [mc/h] = 3,1 x P diss [kcal/h] / (t a - t e ) [°C]
P diss is the power expressed in kcal/h dissipated by all the devices installed in the installation environment.
ta= ambient temperature, te=external temperature. In order to take leaks into account, it is necessary to increase
the value obtained by 10%.
The table shows an example of a flow rate with (t a - t e ) =5°C and a rated resistive load (pf=0.9).
(Note: This formula is applicable only if ta>te. If not, the UPS installation requires an air-conditioning system).
(3) The dispersion current of the load is added to that of the UPS on earth wire.

INSTALLATION

(1)
(1)
(3)