Télécharger Imprimer la page

Ayce EH900 BALI Manuel D'utilisation page 38

Publicité

Les langues disponibles

Les langues disponibles

Part
Part name
No.
M6 × 50 Hexagon
9
head bolts
Remote control
10
unit
11
Castor
12
Foot sheath
13
Base Foot
14
Washer D6
Qty
Pictures
4
1
2
2
2
4
INSTALLATION INSTRUCTION
Precaution:
1.
Installation should always be carried out by a qualified
electrician or a competent person.
2.
The energy supply must be done through a properly
grounded socket.
3.
The heater must be installed so as to prevent that the
switches can be touched from those who are in the
shower.
4.
Ensure that there is no possibility of inflammable
material coming into contact with the heater, or lies
near the heater.
5.
Heaters should not be installed in areas where
hazardous vapours may be present. Defined in
BS5345.
6.
The heaters are fitted with safety guards. These are
intended only to stop large objects from hitting the
emitters. On no account should the heater be operated
with the guard removed.
74 | 75
GB

Publicité

loading