Installation; Safety; General Safety Instructions; Regulations, Standards And Instructions - Stiebel Eltron SBB 301 WP Utilisation Et Installation

Masquer les pouces Voir aussi pour SBB 301 WP:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 25

INSTALLATION

Safety

INSTALLATION
6.
Safety
Only a qualified contractor should carry out installation, commis-
sioning, maintenance and repair of the appliance.
6.1

General safety instructions

We guarantee trouble-free operation and operational reliability
only if the original accessories and spare parts intended for the
appliance are used.
6.2

Regulations, standards and instructions

Note
Observe all applicable national and regional regulations
and instructions.
6.3

Water installation

6.3.1 Cold water line
Steel or copper pipes or plastic pipework are approved materials.
A safety valve is required.
6.3.2 DHW line
Copper, stainless steel or plastic pipework are approved materials.
Material losses
!
If a flanged immersion heater is fitted and plastic pipe-
work systems are used at the same time, observe the
maximum permissible temperature / the maximum per-
missible pressure in chapter "Specification / Data table".
Operate the appliance only with pressure-tested taps and valves.
7.

Appliance description

7.1

Standard delivery

Delivered with the appliance:
- Cold water inlet pipe with flat gasket
- Adhesive rosettes for connecting lines
- DHW sensor
- Adjustable feet
- Fixing straps with closure element
- Thermometer (in its delivered condition located in the DHW
outlet)
- Adaptor with flat gasket for connecting a DHW circulation line
www.stiebel-eltron.com
7.2

Accessories

Depending on the static pressure, safety assemblies and pressure
reducing valves are available. These type-tested safety assemblies
protect the appliance against unacceptable excess pressure.
If it is not possible to fit an anode rod from above, install a seg-
mented signal anode.
Flanged immersion heaters are available as accessories.
8.

Preparations

8.1

Installation site

Always install the appliance in a room free from the risk of frost
and near the draw-off point.
f Use the adjustable feet to compensate for any unevenness in
f
the floor.
Minimum clearances
≥800
f Maintain the minimum clearances.
f
≥300
SBB 301-501 WP SOL |
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sbb 302 wpSbb 401 wp solSbb 501 wp sol

Table des Matières