Riello RG1RKD Instructions Pour L'installation, L'utilisation Et L'entretien page 35

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3.
INSTALLATION
3.1 BOILER FIXING
Fig. 2
Fig. 3
Put on the flange (1) the screw and two nuts, (see fig. 3).
Widen, if necessary, the insulating gasket holes (5), (see fig. 4).
Fix the flange (1) to the boiler door (4) using screws (2) and (if necessary) the nuts (3) interposing the
insulating gasket (5), (see fig. 2).
3.2 FUEL SUPPLY
1
The burner is designed to allow entry of the oil supply pipes on either side.
Depending on the oil supply pipes position (to the right or to the left hand side of the burner) the fixing plate
(1) and cable clamp (2) should be reversed, (see fig. 5).
2305
S7189
Fig. 5
2
3
GB
Fig. 4
D5012
1
D5701

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

366 t13736650

Table des Matières