Free Room; Installation - Daikin Zanotti GS Notice De Mode D'emploi Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6.4 Free room

When installing the unit leave enough free room to allow opening, correct use and easy maintenance in
safe conditions.
6.5 I nstallation
Secure the condenser unit to the wall by means of the specially supplied Fischer screws.
Install the evaporator as follows:
A)
Drill the holes in the ceiling keeping the necessary distance from the wall 140 cm.
A
Evaporator GS340
B)
Please select the matching cable length for sensor cables and power cables between the evaporating unit
and the condensing unit. (The length must be equal to the length of the pre-charged pipe for the models
SPO/GS and standard length of 10 meters for the models DBO/DBS up to the model 135).
C)
Fit a drain line to the condensate water drain connection in the lower part of the evaporator.
22
B
C
Mod
B
GS 1
260
GS 2
260
GS 3
250
C
663
1083
1663

Publicité

Chapitres

Table des Matières
loading

Table des Matières