Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

allow installation and maintenance. In case valve packages are to be installed, make sure that there
is enough room left.
–  Sound travels very easily through hard materials. Soft rubber material can be used to reduce
contact noise.
–  With cooling: insulate the hydraulic pipes
Device installation guidelines:
–  Do not insert objects into the supply and return air openings.
Starting:
Start-up and commissioning of the fancoil must be carried out by skilled staff, qualified to work on
this type of product.
–  The unit is positioned correctly.
–  The supply and return pipes are properly connected and insulated.
–  The pipes are clean and air is removed.
–  The wiring connections are correct and properly tightened.
–  The supply voltage is correct.
Run the unit for minimal 3 hours and check for abnormalities.
2. SYMBOLS
Danger
Danger: electrical hazard
Danger: sharp edges / components
Danger: hot surfaces
Danger: moving parts
Attention: important warning
Enviromental safeguard
VDC - direct current
VAC - alternating current
50

Publicité

Table des Matières
loading

Produits Connexes pour Jaga Mini Canal Hybrid

Table des Matières