elco AEROTOP SPLIT Mode D'emploi Pour L'utilisateur page 23

Masquer les pouces Voir aussi pour AEROTOP SPLIT:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 53
Scheduling
Operation preparation
ATTENTION
Installation, maintenance and any other
interventions must be performed by fully
qualifi ed personnel, in conformity with all
applicable regulations and the instructions
provided by the manufacturer.
In the event of faults and/or malfunction,
switch the device off and do not attempt to
perform any repairs yourself.
Contact a qualifi ed professional instead.
Filling of the system
Check regularly the water pressure on the
gauge and verify, in cold condition system,
that the value is between 0.5 and 1.5 bar.
If the pressure is below the minimum value,
it is necessary to refi ll it by tap 'L' .
The suggested value is 1.2 bar.
AEROTOP SPLIT WH
AEROTOP SPLIT FS
L
L
L
23 / GB

Publicité

Table des Matières
loading

Table des Matières