Télécharger Imprimer la page

dirna Bergstrom Flex Power II Instructions De Montage page 12

Kit complet evaporateur vertical grand 24v sans chauffage

Publicité

Les langues disponibles

Les langues disponibles

EN
2
Place evaporator unit in a suitable place in the
cabin.
3
Mark evaporator fastening points.
4
Make holes of Ø 7, if they are to be through holes
or Ø 9 if M6 rivet nuts are to be used.
5
Fix evaporator with (4) 6 / 100x15 screws with
grower washers and flat washers if M6 nuts rivet
are used and with (4) 6 / 100x25 screws if they are
through holes (if secured to the ceiling it should be
fastened by inserting screws with flat and rubber
washers on the outside of the cabin and fixed inside
with flat washers and M6 nuts, this is done to avoid
water entering the cabin).
5
12
®

Publicité

loading

Ce manuel est également adapté pour:

Dual power ii