Maintenance; General Instructions; Refrigerant; Preventive Maintenance Programme - Boge DS2 Manuel D'utilisation

Sécheurs frigorifiques
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 15
6

Maintenance

a) Th e machine is designed and built to guarantee continuous opera-
tion; however, the life of its components depends on the maintenance
performed;
b) when requesting assistance or spare parts, identify the machine
(model and serial number) by reading the data plate located on the unit.
c) Circuits
containing
3
kg
or
ant fl uid are checked to identify leaks at least once a year.
Circuits containing 30 kg or more of refrigerant fl uid are checked to
identify leaks at least once every six months. (CE842/2006 art. 3.2.a,
3.2.b).
d) For machines containing 3 kg or more of refrigerant fl uid, the opera-
tor must keep a record stating the quantity and type of refrigerant used,
an quantities added and that recovered during maintenance operations,
repairs and fi nal disposal (CE842/2006 art. 3.6).

6.1 General instructions

!
Before any maintenance, make sure:
• the pneumatic circuit is no longer pressurized;
• the dryer is disconnected from the main power supply
Y
.
Always use the Manufacturer's original spare parts: otherwise the
Manufacturer is relieved of all liability regarding machine malfunction-
ing
Y
In case of refrigerant leakage, contact qualifi ed and authorized per-
sonnel.
Y
Th e Schrader valve must only be used in case of machine malfunc-
tion: otherwise any damage caused by incorrect refrigerant charging will
not be covered by the warranty.

6.2 Refrigerant.

Charging: any damage caused by incorrect refrigerant replacement car-
ried out by unauthorized personnel will not be covered by the warranty.
Z
Y
At normal temperature and pressure, the R134a refrigerant is a
colourless gas classifi ed in SAFETY GROUP A1 - EN378 (group 2 fl uid
according to Directive PED 97/23/EC)
GWP (Global Warming Potential) = 1300.
!
In case of refrigerant leakage, ventilate the room.
English

6.3 Preventive Maintenance Programme

To guarantee lasting maximum dryer effi ciency and reliability
Maintenance
Activity Description
Activity
more
of
refriger-
Check
Service
Check POWER ON indicator is lit.
Check control panel indicators.
Check condensate drain.
Clean condenser fi ns.
Check electrical absorption.
Depressurize the dryer. Complete
drain maintenance.
Depressurize the dryer. Replace pre-
and post-fi lter elements.
Th e following are available (see par. 8.4):
a) compressor kits;
b) fan kits;
c) automatic expansion valve kits;
d) individual spare parts.

6.4 Dismantling

Th e refrigerant and the lubricating oil contained in the circuit must be
recovered in conformity with current local environmental regulations.
Maintenance Interval
Th e refrigerant fl uid is recovered before fi nal scrapping of the equipment
)
(standard operating conditions
(CE 842/2006 art.4.4).
DS2-30
%
Recycling Disposal
structural work
steel/epoxy-polyester resins
exchanger
aluminium
pipes
aluminium/copper
drain
polyamide
exchanger insulation
EPS (sintered polystyrene)
pipe insulation
synthetic rubber
compressor
steel/copper/aluminium/oil
condenser
steel/copper/aluminium
refrigerant
R134a
valves
brass
electrical cables
copper/PVC
Z
7

Publicité

Table des Matières
loading

Table des Matières