Installing The Unit; Duct Connection; Vertical Installations - Mitsubishi Electric MVZ-A12 Manuel D'installation

Masquer les pouces Voir aussi pour MVZ-A12:
Table des Matières

Publicité

7. Installing the unit

The air handler can be installed in a vertical, horizontal (Right and
The units are designed for "0" zero clearance to combustibles. 24" is
required for service access to the front of the unit. (See Installation
must be mounted level to facilitate proper condensate drainage.
Installation Clearance
TOP View
Vertical Installation
Clearance Area
24"
Width of Unit

8. Duct connection

-See the outline drawing for the size of the duct connection.
-Do not use sheetmetal screws longer that 0.75" to secure any
ductwork to the air handler
TOP View
Horizontal Installation
Clearance Area
24"
Length of Unit
0.75" MAX
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mvz-a18Mvz-a24Mvz-a30Mvz-a36Mvz-a36 aa7

Table des Matières