RADSON H&C module 24V Guide Utilisateur page 6

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 9
5. Wiring
Installation1: Separates systems
S1 DIP switch
B1 Cooling
Configuration
Output
Heating and
Managed by
cooling output :
the UFH digital
programmer
On => only
ON
when cooling
OFF
1
2
demand from
minimum one
zone
B2 Heating Output
B3 Humidity
Drier
Managed by the
Managed by the
UFH digital
UFH digital
programmer
programmer and
On => only when
the 10k sensor if
heating demand
used
from minimum one
On => only when
zone
humidity is
detected.
A B 1 HC Sen 2 4
UFH-DIGITAL
PROGRAMME
R
Humidity sensor: (10k sensor)
Must be mounted on the
incoming water pipe of the
manifold with precautions.
B1
B2
NC
NC
24Vac
24Vac
UFH digital main
programmer zone
4 actuators max
6
S2 DIP switch
P1 Humidity
Configuration
Level
Humidity
5 to 25 °C
sensor :
Setting level to
On : if used
stop the cooling
Off : if not used
output and start
the humidity
ON
drier.
OFF
1
2
B3
L N
L N
WATER
CHILLER
BOILER
These 2 outputs can be used to
control the heat pump
Check the voltage input of the
heat pump before connections.
P2 Humidity
Detection
Time
5 to 60min
Minimum time
for humidity
temperature
detection
P1
P2
S1
L N
HUMIDITY
DRIER

Publicité

Table des Matières
loading

Table des Matières