Removing The Boiler Cladding; Boiler Internal Parts - Cola DOMUSFIRE C17 Manuel D'installation, D'utilisation Et D'entretien

Poêle à granulés
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6 MAINTENANCE
6.1 Introduction
Operations on the internal parts of the boiler must be carried out by qualified personnel. Contact the nearest
authorised service centre.
Make sure the boiler is unplugged and cold before carrying out any work on it.

6.2 Removing the boiler cladding

Key:
1- Pellet hopper door
2- Central middle covers
3- Side panel
4- Front cover
5- Insulated outer door
6- Rear panel

6.3 Boiler internal parts

Key:
1- Knob with threaded rod
2- Turbulator-shaker device extension pin
3- Bush locking nut
4- Pin sliding bush
5- Outer cover
6- Upper thermal protection
7- Middle protection
8- Vermiculite upper protection
9- Vermiculite side protection
10-Chamber outer thermal protection
11- Protection support cover
12-Turbulator support
13-Turbulators
14-Fire door
15-Safety valve
16-Ash door
17-Ash box
18-Heating chamber
61
DOMUSFIRE C17-C24

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Domusfire c24

Table des Matières