Bergstrom Integral power II Instructions De Montage page 19

Masquer les pouces Voir aussi pour Integral power II:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INTEGRAL POWER II
!
Any modification to ROPS/FOPS, such as welding or
drilling holes in the structural members for mounting
brackets, will affect the ROPS/FOPS capability to provide
the required protection. Installing this product may affect
ROPS/FOPS systems.
Contact your authorized dealer to check compatibility
before making any modifications or repairs. Failure
to do so may void the ROPS/FOPS certification. The
manufacturer of the roof air conditioner assumes no
liability whatsoever.
Take down the hatch cover and the
1
attachment elements, and hand them over to
the customer (*).
*
Remove any excess from the roof before
2
attaching the EPDM seal.
2
Warning
1
*
2
19
EN

Publicité

Table des Matières
loading

Table des Matières