Installing 1 AU12 unit
Figure 2.3. Minimum recommended service areas around the AU12 unit (expressed in mm).
Installing 2 or more AU12 units
>300
Figure 2.4. Minimum recommended service areas around the AU12 unit (expressed in mm).

2.6. Assembly

The AU12 unit must be firmly secured. To do so, take the following steps:
Fasten the unit to a firm surface capable of withstanding the weight, vibrations and wind bursts without being lifted,
moving or sinking.
Install 4 silent blocks as legs in the 4 anchoring holed provided. The silent blocks must be perfectly fastened to the base
and the AU12 unit, using screws, nuts or other mechanical means.
Level the unit so the top plate is perfectly horizontal and the side plates are completely vertical.
Up to 6 litres of water can be released during defrosting cycles. Install an adequate system to evacuate this water, taking the
following points into account:
Make sure not to spill this water on surfaces with no drainage, such as asphalt, tiles, etc. This water may freeze due to
low temperatures and make people slip and fall.
>200
>300
>1200
>200
>500
>1200
26
AU12 Installation Manual and Technical Service
>300
>200
>300
>1200