Télécharger Imprimer la page

Camoplast ATV T4S Directives D'installation page 10

Système de traction pour vtt
Masquer les pouces Voir aussi pour ATV T4S:

Publicité

7. Attach the stabilizing rod (B) to the anchor
bracket (A), using the spacer bushings (C), the
flat washer (D) and nut (E). Torque to 70 N•m
[52 lb•ft]. Refer to Figure 10.
NOTE: Ensure that parts are assembled in the
correct order.
Figure 10
8. Verify that spring assembly bolt (F) is tightened
to the recommended torque specification: 40
N•m [30 lb•ft]. Refer to Figure 11.
Figure 11
9. Inspect the rear Track Systems and ensure that
all mounting bolts were correctly tightened
during installation. Lower the vehicle on the
ground and proceed to install the front Track
Systems.
Installation Guidelines / Directives d'installation
7. Fixer le bras stabilisateur (B) au boulon déjà
installé sur l'ancrage de suspension (A) à l'aide
des espaceurs (C), de la rondelle (D) et de
l'écrou autobloquant (E). Serrer à un couple de
70 N•m [52 lb•pi]. Voir la Figure 10.
NOTE : Assurez-vous d'assembler les pièces dans
l'ordre indiqué.
8. Vérifier que le boulon du ressort (F) est serré au
couple recommandé : 40 N•m [30 lb•pi]. Voir la
Figure 11.
9. Inspecter les systèmes de traction arrière et
s'assurer que tous les boulons ont été serrés
correctement lors de l'installation. Abaisser
ensuite le véhicule au sol et procéder à
l'installation des systèmes de traction avant.
Page 10
©2015 Camoplast Solideal inc.

Publicité

loading

Ce manuel est également adapté pour:

Utv t4s