WIKA P-30 Mode D'emploi page 15

Masquer les pouces Voir aussi pour P-30:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Commissioning, operation
6.1 Making the mechanical connection
Required tool: Open-ended spanner (spanner width 27 or 41)
With flush process connections, remove the protection cap not until shortly
before mounting. During installation, ensure that the diaphragm is not
damaged.
During mounting, make sure that the sealing faces at the pressure
transmitter and the measuring point are clean and undamaged.
Only ever screw in, or unscrew, the instrument via the spanner flats. Never
use the case as a working surface.
The correct torque depends on the dimensions of the process connection
and the sealing used (form/material).
When screwing in, avoid any jamming of the threads.
For information on tapped holes and welding sockets, see Technical Information IN 00.14 at
www.wika.com.
Types of sealing
Parallel threads
per EN 837
1
WIKA operating instructions precision pressure transmitter model P-3x
per DIN 3852-E
1
Tapered threads
NPT, R and PT
EN
max. 10 Nm
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

P-3 sérieP-31

Table des Matières