Télécharger Imprimer la page

JUMO tecLine pH Notice De Montage page 12

Publicité

Les langues disponibles

Les langues disponibles

The seal in the KCl connection (6) may make it more
difficult to insert the electrode. If necessary, moisten
the electrode shaft (5) with water to facilitate insertion.
Screw the combination electrode (5) into the KCl connection (6)
by means of the Pg13.5 screwed gland (1). Maximum tightening
torque is 3 Nm.
Push the washer (10) and the O-ring (11) onto the electrode.
The filling spout (7) can be connected to a KCI reservoir (e.g. Part
No. 00060254) using a 6 × 1 dia. hose:
Unscrew the union nut of the filling spout (7) and slide it onto the
hose leading to the KCl reservoir.
Push the hose onto the opening of the filling spout (7) and fix it
with the union nut.
Calibrate the combination electrode, if required.
Screw the KCl connection (6) with the mounted combination
electrode into the appropriate fitting.
Always position the tool at the hexagon part of the
pressure screw (9), never at the hexagon part of the
pressure connection (8) when screwing in or uns-
crewing the KCl connection!
To correct the position of the filling spout (7), loosen
the pressure screw (8) first, correct the position, and
then retighten the pressure screw.
Connect the measurement cable.
After installation (in the case of flow-through fittings),
open any shut-off valves that may be present, in order
to start the process flow.
Mount the immersion fittings in the container that is to
be used (pipe clips, flange or similar)
The combination electrode is now ready for use.
4

Publicité

loading

Ce manuel est également adapté pour:

201020/76-18-09-22-180/833