INSTALLATION
1). Use a stud finder to locate the dry wall studs and mark the desired installation
with a pencil.
2). Attach the Wall Plate Template (BB) to the wall at the desired installation location.
3). Ensure the Wall Plate Template (BB) horizontal
mark 6 lag bolt installation locations on the stencil and the wall. Attempt to locate the lag bolt
locations
on the
middle
4). Use a 7/32" (5.5mm) drill bit to drill a pilot hole on the wall with a depth of at least 2.6" (65mm).
Please note, failure to drill pilot holes may result in the lag bolt heads snapping during installation.
Secure the Wall Plate to the wall with 6 x Lag Bolts ( H) and 6 x Washers
(H). NOTE: Do not use Wall Anchor (l) for wood stud installation.
OPTION
1: Wood
of the
studs.
www.multibrackets.com
Stud Installation
(Suitable for
alignment
is verified with a bubble level and
• Tighten screws so that wall plate is firmly attached.
but do not overtighten. Overtightening can damage
screws, greatly reducing their holding power.
or
studs)
locations
1
2
65mm
5_5mm
ø7/32"
WARNING
5