Page 1
Façade
Assemble the ridge plate with the bulges pointing downward, in the bolt slots. You assemble 2 façades.
Mount the profiles FA & FB with the small hole (Ø3) towards the ridge side (see detail 10).
Page 2
Stop bolts
!10! stop bolts are placed per facade!!!
Page 3
Sidewall + stop bolts
Stop bolts are placed on each sidewall (see detail 1 and detail 5). You assemble 2 sidewalls in total.
Number of stop bolts per sidewall:
Greenhouses with less than 7 windows:
-
-
Greenhouses with 7 or 8 windows:
Greenhouses with 9 or 10 windows:
-
-
The length of Profiles A & B depend on the type of greenhouse you have purchased.
R204
2981
Page 4
Assembly
Repeat pages 1,2 and 3 for the second gable and side wall. You now have 2 gables and 2 sidewalls.
Slide the panels one into the other until the end, the stop bolts are immediately tightened firmly and definitively.
Page 5
Roof
-
The lengt of Profile B and C depend on the type of greenhouse you have purchased.
PROFILE B:
PROFILE C:
-
First install the ridge (profile C) on top of the 2 façades and fix it definitively with the stop bolts.
-
Greenhouses that are 7 & 8 windows long are provided with 2 glass rods (profile A) of each 2 stop bolts.
-
Place the glass rods (profiles A) between the sidewall and the ridge you just put in place (profile C) .
-
Assemble the traction strips (profiles B) to the ridge (profile C) in the corner and subsequently together
with the glass rod (profile A) at the sidewall.
R205
R206
R207
R208
3720
4458
5196
5935
R204
R205
R206
R207
1385
1873
1873
2483
R204
R205
R206
R207
2981
3720
4458
5196
2 stop bolts per side wall
3 stop bolts per sidewall. Place an extra stop bolt at detail 1 and
slide it into the middle of the profile.
4 stop bolts per side wall. Place 2 extra stop bolts at detail 1 and
slide it into the middle of the profile.
R209
R210
6673
7412
R208
R209
R210
2483
2483
2483
R208
R209
R210
5935
6673
7412
N