Télécharger Imprimer la page

VEVOR GYFF3V0 Manuel page 10

Publicité

1. Parts and components of the stacker should be complete and sound, as well as properly
adjusted and tested before delivery to the factory.
2.
Check to see that all parts and components of the stacker are complete and sound upon
unpacking. The stacker shall only be operated if everything's been proved to be all right
about it.
3.
The operational environment and conditions ,the load to be carried, and stacker's
traveling must meet basic requirements and instructions for safe operation.
4.
The fork needs to be raised; just wind the crank handle clockwise; if the crank handle is
released, the fork will be stopped still.
5.
If the fork needs to be lowered ,just wind the crank handle counterclockwise; the
lowering speed can be controlled through controlling the winding speed.
6.
The stacker will be braked to still if the brake is pressed; the brake will be released if the
brake is raised.
1.
Routine maintenance and immediate replacement of wearing parts will prolong the
stacker's lifetime as well as shorten its downtime.
2.
Repairs and maintenance must be performed by experienced professionals.
3.
Assembly and disassembly shall be performed with reference to the Explosive
View if repairs or maintenance are necessary.
4.
Repairs or maintenance shall be performed with reference to the detailed Parts List,
and the wearing parts shall be replaced immediately.
5.
Clean, inspect regularly, and lubricate.
OPERATING INSTRUCTION
MAINTENANCE
- 9 -

Publicité

loading