eXact Pipecut V1000 Mode D'emploi page 11

Masquer les pouces Voir aussi pour Pipecut V1000:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Operation
Exact PipeCut V1000
pipe saw operating
instructions
Before use
Check that the motor unit is in the
upright position so that the yellow
mark on the unlock button is visible.
Check that the blade is suitable for the material of
the duct that is intended to be cut.
Check that the blade is correctly in place and that
it is in good condition.
Check that the guide wheels are rotating.
Check that the support wheels are rotating.
Check that the lower blade guard is moving correctly
up and down.
Check that the duct intended to be cut is empty.
Connecting the Exact Pipe Cut V1000 to the main
power supply
Ensure that the mains voltage is the same as
indicated on the rating plate (Figure A/13)
Connect the Exact Pipe Cut V1000 to the power
outlet only after having checked these operating
instructions.
Setting and marking the cutting point
Mark the cutting point, but remember that you have
to cut the duct so that you approach the duct seam
towards the undivided side of it (Figure C). One
mark is enough. You do not need to mark all the
way around the duct.
Setting the supports for the duct to be cut
The supports for the duct are not delivered with the
Exact Pipe Cut V1000 but they are recommended
accessories. The supports maximise safety and
optimise the cutting result. They also reduce the
size of the required space for cutting the duct.
The cutting should always be done on a flat surface.
Place the duct on three supports so that the middle
support is directly beneath where the duct is intended
to be cut (Figure B). Make sure that all of the
supports are in contact with the duct. Proper
arrangements prevent the saw blade from jamming
in the duct in the final stage of the cutting process.
In case you are not using the supports you need to
do the following. Make sure that there is enough
space for the duct to rotate a full circle. Place the
Exact Pipe Cut V1000 so that the electric cord is
hanging in front of the duct from where you are
standing (Figure C). Also make sure that there is
enough loose cord to ensure free movement for the
duct. If necessary, use a suitable extension cord.
To start sawing
Open the safety screw (Figure D1) and adjust the
wheel pairs in the Pipe Cut steering device according
to the diameter of the duct by rotating the adjustment
knob on the back of the Pipe Cut (Fig. D2)
Fig B
Fig C
Fig D
11
e n g l i s h
Cutting point
Cutting mark

Publicité

Table des Matières
loading

Table des Matières