● ADJUSTING THE TOOL:
● BLIND NUT INSTALLATION:
Before installation first carry out the 'tool setting'.
• Insert nut in to the hole and verify that hole/nut/tool are well aligned.
• Press the button during the whole installation cycle (about 1 second).
IMPORTANT :
Accompany the automatic
unscrewing by pulling the tool
back slightly.
● CHANGE MANDRELS:
1
2
• Remove the battery.
• Unscrew and remove the piece
• Roll up the stroke set
5
the mandrel
.
1
• Replace the mandrel.
• It is recommended to oil
or grease the mandrel
before use in order to
prevent premature wear.
MAINTENANCE / TROUBLESHOOTING / SAFETY INFORMATION
See user manual.
OPERATING INSTRUCTIONS
9
10
8
See user manual.
3
.
2
then unscew
5
28 rue Paul Dubrule - 59810 LESQUIN - Tél. : 03 20 32 98 18 - technique@scellit.com - www.scellit.com
5
3
6
7
● BATTERY LEVEL INDICATOR:
4 lights on the battery panel allows you to check the remaining
power. Press and hold the blue button to check the battery level :
● REMOVE THE BATTERY:
Battery
To remove the battery, press the 2 unlock buttons
battery.
● LED LIGHTS:
The tool is equipped with 3
powerful LED lights to enlight
the work place.
Turn on the light only
1
Press the trigger half way to
turn on the light. The lights will
shutdown after 10'.
Turn on the tool with the lights on
Press the trigger to set the rivet/blind nut. The lights turn on and
remain on until 10' after the trigger is released.
S E R V I C E T E C H N I Q U E
2
1
Mandrel
1
2
Anvil and locknut
3
Stroke set with serrations
4
Hole to release jammed nut
4
Tool body
5
6
Button
Battery switch
7
Belt clip
8
Battery level check button
9
Battery level indication
10
The information on the battery panel can vary
(+/- 5%) due to environmental conditions.
100%
75%
50%
Red light on the charger:
25%
the battery has to be charged
is locked to the riveting tool with a spring.
Green light on the charger:
the battery is fully charged
and slide the
6