Les langues disponibles

Les langues disponibles

H-9410
GLO BRITE
RUNNING
®
MAN SIGN – DOUBLE SIDED
TOOLS NEEDED
Phillips Screwdriver
Sign x 1
• The sign should be charged with an external
illumination source for a minimum of 60 minutes to
obtain full operational conditions.
• The sign should be mounted in a manner that
ensures rigidity and mechanical sufficiency.
• External illumination source must be reliable and
supplied by a circuit, not controlled by automatic
timers or sensors, and must have controls that are
accessible only to authorized personnel.
• External illumination source is to be energized at all
times during building occupancy.
• Lighting levels on the sign faces should be
confirmed after any change in external lighting
types or levels.
Sign is designed to operate automatically. Charging
light source must illuminate faces of sign in accordance
with at least 21.6 lux of LED, fluorescent, metal halide
or mercury vapor light at all times during building
occupancy to ensure that the sign will remain legible for
at least 30 minutes.
PAGE 1 OF 9
1-800-295-5510
uline.com
Drill
Level
PARTS
Mounting Bracket x 1
SAFETY
OPERATION
Assembly
Anchor x 4
(mounting hardware)
Screw x 3
• It is recommended that periodic visibility tests be
performed in accordance with all applicable codes.
• Install this sign indoors only, where not exposed to
direct sunlight, liquid spray or temperatures outside
the range of 50°-104°F.
• Cleaning the sign faces with a damp cloth is
recommended during monthly inspections.
• When a retrofit involves the replacement of existing
electric exit signs, the electric junction box must be
sealed with an approved blank cover plate before
installing.
Para Español, vea páginas 4-6.
Pour le français, consulter les pages 7-9.
Screw x 4
(mounting hardware)
0125 IH-9410
Table des Matières
loading

Sommaire des Matières pour Uline H-9410

  • Page 7: Outils Requis

    H-9410 1 800 295-5510 uline.ca GLO BRITE – ENSEIGNE DE SORTIE – HOMME QUI COURT, DOUBLE FACE OUTILS REQUIS Tournevis cruciforme Perceuse Niveau à bulles PIÈCES Ancrage x 4 Vis x 4 Enseigne x 1 Support de fixation x 1 (matériel d'installation)
  • Page 8 INSTALLATION • Pour une installation sur une cloison sèche ou un dans le support de fixation et en maintenant le bloc en béton, utilisez un ensemble d'ancrage support à l'emplacement souhaité sur le mur ou d'extension pour assurer une prise ferme. le plafond.
  • Page 9: Fixation Au Plafond

    Vissez quatre vis à travers les trous de fixation du support de fixation pour le fixer au plafond. 4. Faites glisser le support de fixation dans le profilé supérieur. (Voir Figure 7) Figure 7 Support de fixation 1 800 295-5510 uline.ca PAGE 9 OF 9 0125 IH-9410...

Table des Matières