Makita UH5570 Manuel D'instruction page 10

Masquer les pouces Voir aussi pour UH5570:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Set the crank at the angle as shown in the figure with a
slotted bit screwdriver.
1
► 1. Crank
Remove two screws from the shear blades and the
shear blade unit will be taken out.
1
2
► 1. Screws 2. Shear blade
CAUTION:
Return the gear to the original position in such
a manner as it was installed if it should be taken
away by mistake.
Installing the shear blade
Prepare 4 removed screws (For under cover), 2 screws (For shear
blade), gear housing cover, under cover, and new shear blades.
Adjust the crank position as shown in the figure. At
this time, apply some grease provided with new shear
blades to the periphery of the crank.
► 1. Crank
Overlap the oval hole in the upper blade with that in the
lower one.
1
► 1. Ellipse of shear blade
Take out the blade cover from the old shear blades and
fit it onto the new ones for easy handling during the
replacement of blades.
Place the new shear blades on the tool so that the oval
holes in the shear blades fit onto the crank. Overlap the
holes in the shear blades with the screw holes in the
tool and then secure them with two screws.
2
► 1. Ellipse of shear blade 2. Crank
1
10 ENGLISH
1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Uh6570

Table des Matières