Télécharger Imprimer la page

SFA SANICUBIC 1 Mode D'emploi page 11

Publicité

1
DESCRIPTION
The SANICUBIC
1 is a lift station
®
designed to evacuate effluent from resi-
dential and light commercial applications.
This pumping station is (manufactured
in a factory which is quality) certified to
ISO 9001. Installed and used correctly,
the unit will give consistent and reliable
service.
Please comply with all the installation
and maintenance specifications set out
in these instructions, and especially the
information marked with the following
signs:
«
» Failure to comply with this
information could entail safety
hazards for personnel,
«
» Information warning of the
presence of an electrical hazard,
«
» Instructions only for qualified
professional specialists,
«WARNING» Failure to comply with this
information could affect the normal
operation of the equipment.
Please contact our Customer service for
further information.
SANICUBIC 1 OPERATING
PRINCIPLE
SANICUBIC
1 contains 1 pump equipped
®
with a high performance grinding system.
The SANICUBIC
1 tank is fitted with
®
3 dip tubes; 2 tubes control the motor
operation, and the other one controls the
alarm system.
- Long pickup tube (normal operation): as
soon as the waste water level in the tank
reaches the triggering point in the long
tube, the pumping system starts up.
- Short pickup tube (inflow overload
operation): if the waste water level in the
tank reaches the upper point, a contact
is activated. This contact sets off a visual
alarm on the control panel. If the external
wired alarm is connected, this would give
you an audible and visual alarm.
2
TECHNICAL DATA SANICUBIC
Type
Maximum discharge head
Voltage
Frequency
Volume
Maximum power input
Maximum current input
Electrical classification
Avg. water temp for optimum performance 104°F
Maximum temperature (intermittent)
Protection index
Net weight (including accessories)
*Hot water drain cycles from dishwashers or washing machines
3
INSTALLATION
The SANICUBIC
1 must be installed in
®
compliance with local plumbing codes.
The equipment must be commissioned
and maintained by a qualified
professional specialist.
REGULATIONS
3a
1- Attention: the space in which the
SANICUBIC
1 is to be installed must
®
be large enough to leave at least 24''
of working room around and above
the unit to facilitate such maintenance
work as may be required. There must
be sufficient lighting, and it must be
sufficiently well ventilated and
protected from freezing.
2- Isolating valves (not supplied) must
be fitted on waste inlets (especially
the 4'' inlets) and on the discharge
to ensure that any service/
maintenance may be carried out
safely.
3- The discharge pipe must be fitted
so as to avoid all back flow from the
drainage system. Back flow can be
avoided by installing an anti-back flow
riser reaching a high point above the
maximum back flow level.
Comment: In the absence of local
information to the contrary, the
maximum back flow level corresponds
to street level (roadway, pavements,
etc.). Continue the discharge pipework
after the anti-backflow riser, using a
larger diameter pipe.
4- If the SANICUBIC
space such as a pit for example, we
would recommend the fitting of a bilge
pump in case of flooding.
5- The lifting station must be vented with
an open vent outlet at roof level. Do
not use an air admittance valve as the
pump will not function correctly.
6- The lifting station must be fixed to the
floor.
CONNECTING THE DISCHARGE PIPE
3b
Remove the end cover or covers from the
back of the unit.
As the motor is fitted with a grinding
system, an 1-
/
'' discharge pipe can be
1
2
used.
The discharge bend is at the center of the
unit, at the back. Use a standard 1-
coupling to connect it to the riser pipe
1
®
and secure in place with metal clamps.
R350
The pump in the SANICUBIC
equipped with a check valve.
36 Ft
120 V
CONNECTING SANITARY
3c
60 Hz
EQUIPMENT TO THE LOWER
8.5 Gallons
INLETS
1 HP
If you want to install a shower, bath
10 A
or even a toilet at the same level of
I
the Sanicubic 1, you must make
sure that the outlets of each fixture are at
least 10" above the base of the Sanicubic
158°F*
1. (ie. If connecting a rear outlet toilet to
IP68
the Sanicubic 1, the back spigot of the
45 IBS
bowl (cl) should be 10" above the base of
the Sanicubic 1.)
CONNECTING THE 1-
3d
• Cut off the end of the 1-
a saw
• Cut the sleeve
diameter: 1-
/
1
4
• Fix the sleeve
pipe, using the metal clamps.
1 is installed in a
®
/
''
1
2
1 unit is
®
/
'' INLETS
1
2
/
'' inlet with
1
2
to suit the pipe
C
'' or 1-
/
''
1
2
on the inlet and on the
C
CONNECTING THE 4'' INLETS
3e
Lower inlets
1- Remove the plug from the side inlet.
2- Fix the sleeve
in place using the
F
metal clamp.
.
G
3- Fully insert the 4'' tube in the other end
of the sleeve and fix it in place using
the other metal clamp.
.
G
Upper inlet
1- Cut off the upper end of the 4'' inlet
with a saw.
2- Fix the sleeve
in place using the
F
metal clamp
.
G
3- Fully insert the 4'' tube in the other end
of the sleeve and fix it in place using
the other metal clamp
.
G
CONNECTING THE VENT
3f
1- VENT OF SANICUBIC
1
®
The upper inlet must be used for the
vent. The vent pipe must be fitted up to
roof level.
Then fix the sleeve
in place using
C
the metal clamp
.
E
Fully insert the 1-
/
'' tube in the other
1
2
end of the sleeve and fix it in place using
the other metal clamp
.
E
WARNING: Note that the vent
system should be a two-way air
vent. The use of mechanical vents,
air admittance valves or similar
devices are not permitted as these
are considered one-way air vent
systems.
The vent must be an open vent or
the unit will not operate.
2- VENTING THE ELECTRICAL SECTION
Connect the 8/11 clear PVC tubing (
supplied to the keyboard on the
SANICUBIC
1. The other end of this
®
tubing must be located between 3 Ft
and 6 Ft above the device to avoid
water getting into the electrical part in
the event of flooding.
Important: Do not pinch the tubing.
SECURING THE SANICUBIC
3g
UNIT TO THE FLOOR
The SANICUBIC 1 unit is equipped with
fittings to hold it on the floor and prevent
it from turning or moving.
1- Place the unit on the desired spot.
2- Locate the 2 holes for attachment to
the floor.
3- Place the 2 anchors
on the floor.
A
4- Fix the unit in place with the screws.
CONNECTING TO ELECTRICAL SUPPLY
3h
All wiring should be in accordance with
the applicable electrical code in your
region. The grinding system requires a
single-phase 120-volt, 15 Amp.
supply. When installed in a bathroom, the
receptacle should be 40 inches away (in
straight line) from a shower or bathtub.
Connect only receptacle protected by a
ground fault circuit interrupter (GFCI).
WARNING: Risk of electric shock - this
pump is supplied with a grounding
conductor an grounding type attachment
plug to reduce risk of electrical shock.
Be certain that it is connected only to a
properly grounding - type receptacle.
)
I
1
®

Publicité

loading