EN | EVO - EVOK | User and Maintenance Manual
1 CLOSE MULTIDECK DISPLAY POSITIONING
Before to unload/download and positioning the Close Multideck Display inside the shop/kitchen,
we invite you to read carefully this instruction manual and the paragraphs regarding: unloading/loading,
dimensions, weight, evaporating water basin, adjustable feet, electric connections and maintenance.
1.1 TRANSPORT
NO
1.2 UNLOADING / DIMENSIONS / WEIGHTS
Kg
The manufacturer declines any responsibilities due to operations performed without adopting the above safety precautions.
1.3 PACKING
At the delivery please check that the packing is intact and that during transport no damage was
occurred. Remove the external carton-box; remove the fastener that keeps still the Close Multideck Display to its
pallet, put it in the correct position and then remove the adhesive white protection of the stainless steel (if present).
The recovery and the recycling of the packing materials such us, plastic, iron, carton box, wood help the saving
of row material and reduce the waste. Please consult your area address book for disposal of materials and
authorized garbage dump.
1.4 POSITIONING AND FEET REGULATION
1.5 INSTALLATION INSIDE YOUR SHOP/RESTAURANT/WORKROOM
The equipments are tested in test-room with ambient temperature of +25°C and relative humidity
60%, therefore, if the ambient in which the equipment is installed has different conditions of ambient temperature
and relative humidity, it could be verified a malfunction and the equipment will not run properly (making inside
condensation....etc). It is advisable to install the equipment inside an area with an air conditioning system. Please
note that malfunctions may arise in areas that are not provided with air conditioning, e.g. condensation formation.
28
Do not superimpose Close Multideck Display packing (allowed only if
SI
there is wooden crate packing option).
We recommend you to transport the Close Multideck Display always in the upright
position (as mention on the packing). If the Close Multideck Display with built in
condensing unit was inclined during transport we suggest you to keep the product
in the suggested upright position for at least 8 hours, before switching it on. In this
Kg
way, you will allow the oil to flow in all the components, lubricating them again.
Afterwards you can proceed with the start.
The unloading/loading procedures should be executed by pallet-jack or by forklift
driven by skilled and authorized staff. We decline any liability for failing to comply
with safety rules currently in force.
Before starting the unloading, positioning and installation procedures of the Close
Multideck Display inside the shop/kitchen according to the model of the Close
Multideck Display, please read carefully the information in the technical data
("APPENDICE - 3" Pag. 94).
Place the Close Multideck Display in a perfect horizontal position,
acting if necessary on the screw type adjustable feet. Use a spirit level to
check it. The Close Multideck Display must be placed in order to operate
properly and allow the correct defrost condensate water draining. In this
way you will avoid noisy vibrations of the condensing unit. Check the correct
positioning of the condensate water basin and its draining.