4
Remove mounting hardware from parts bag
and verify included part quantities.
7A
support or hardware.
Use provided cable clutch hardware to secure
each cable.
9
Have one or two people slowly lifting the
machine while the other pulls the free end of
the cables to keep them taut.
the unit relatively level during lifting.
stay oriented correctly and do not get
misaligned or they may not hold properly.
5
on type of ceiling, attach proper mounting
hardware above installation area per local
Ideally the mounting locations would be 23" x
7B
Remove cross-tee where unit will be installed.
10
contacts the bottom of the grid.
6
before setting it door side down on the box.
Determine which electrical knockout will be used
and remove it.
8
Secure the hooks from the provided
aircraft cabling to the housing through the
mounting holes.
11
add centering blocks between unit and grid.
Trim out as desired.
3