Télécharger Imprimer la page

Frigidaire FFGW2426USA Instructions D'installation page 7

Publicité

Les langues disponibles

Les langues disponibles

GAS WALL OVEN INSTALLATION INSTRUCTIONS
After connecting gas, check
system for leaks with a manometer. If a manometer
on the gas supply to the unit and use a liquid leak
detector at all joints and connections.
gas leakage in the wall oven or supply line.
IMPORTANT: A pipe joint sealant resistant to the
action of LP Gas must be used on all pipe connec-
tions.
from gas connections. Checking for leaks with a
if necessary to prevent
from the gas supply piping system during
any pressure test greater than ½ psig.
valve during any pressure testing of the gas supply
piping system at test pressures equal to or less
than ½ psig.
Note: Do not remove the Pressure Regulator.
These models have an electric broiler element. No
adjustments are required to this element during fuel
type conversion.
Gas (see Figure 11).
Pressure
Regulator
Spring
DO NOT
REMOVE
Conversion
Remove storage drawer by pulling drawer out to
stops. Lift drawer front to clear stops and pull out.
Locate pressure regulator on lower back wall and
convert as shown in Figure 11.
1. Remove the cap from the pressure regulator.
2. Remove the plunger.
3. Turn the plunger upside down with the enlarged
end TOWARDS regulator.
4. Replace the plunger inside the regulator. The
letters LP or 10" W.C. should be visible on the
exposed end of the plunger.
5. Replace the cap on the pressure regulator.
NOTE: The type of gas pressure the regulator is set
for is indicated on the top of the plunger.
7
Place hollow
Place solid
end towards
end towards
regulator for
regulator for
NATURAL GAS.
PROPANE GAS..
To remove from or lock in
cap: Turn conversion
plug 1/4 turn.
Plastic
Cap
Gasket
Plug

Publicité

loading

Ce manuel est également adapté pour:

Ffgw2426ubaFfgw2426uwb