Télécharger Imprimer la page

Teddington COOLEO 15 Manuel D'installation Et D'utilisation page 26

Climatiseur mobile refroidi à eau

Publicité

Les langues disponibles

Les langues disponibles

DE
automatic defrost system can star working; periodically the internal unit fan stops and the two refrigerant
electro-valves invert their position. Thus, hot gas passes in the iced evaporator, and the ice falls down as
water. Display shows "dEFr".
After every defrost cycle, machine works regardless environment temperature for 90 seconds in order to move
the air in the room. At the end of these 90 seconds, PCB check thermostat state.
To lift the machine from its packing, attach an integral lifting rope to the lifting plates shown in the figure.
After placing the machine on its wheels, move the machine from the side handles.
The side handles should only be used to TRANSLATE the unit.
For the LIFTING of the machine instead it is mandatory to use the appropriate eyebolts supplied as
accessory kit or with other suitable means.
Two maintenance operations are very important:
5. LIFTING AND MOVING
6. PERIODICAL MAINTENANCE
26

Publicité

loading