Télécharger Imprimer la page

Krick RoMarin Antje Mode D'emploi page 47

Publicité

Les langues disponibles

Les langues disponibles

Fold the pieces in the middle according to drawing
W to one eye and slide them through a crimp
sleeve 6.17 to form a 25 mm eye. Press the crimp
sleeve together with a pair of pliers. Then push the
eyes over the masts and place them on the
wedges. Guide each shroud through a shroud ten-
sioner 6.17, through the corresponding eye and
back through the tensioner. First prepare all
shrouds in this way. Then tighten the diagonally
opposite shrouds with an even, light pull and se-
cure them with superglue, then press the shroud
tensioners together with pliers. Attach the bracket
7.19 and the cleat 7.21 to the stem. Attach fore-
stay 6.18 and signal fall 6.19 with signal ball 6.20
according to drawing. Attach a double eyelet to the
signal ball.
Fig. stem fitting
Fig. signal ball
For the main sheet 6.15 two blocks 6.8 with wire
eyelets 6.7 are attached to the stern.
Fig. sheets for main boom
Stand Mai 2019
M
T
.com
Seite 19
Divide the 6.15 sheet line into 2 pieces of equal
length. Fasten the sheets to the lower eyelet on
the boom and then lead them through the lower
block, back through the upper block and then to
the cleat.
The entire running rigging (all movable ropes) will
now be attached from 0.5 mm yarn 6.22 according
to the photos and the construction plan.
The antenna 6.23 has to be attached to the tips of
the masts with 2 crimp sleeves 6.17. The connect-
ing cable is fitted with a bead 6.24 at the lower end
and a loop to hang it up so that it can be detached
to remove the wheelhouse.
Fig. antenna connection
Stick the flag 7.24 to the flag line 7.25 and attach it
according to the plan.
Fig. flag with flag line
©
Krick Modelltechnik Knittlingen
Connecting cable

Publicité

loading

Ce manuel est également adapté pour:

Ro1110