Télécharger Imprimer la page

Krick RoMarin Antje Mode D'emploi page 43

Publicité

Les langues disponibles

Les langues disponibles

inner handrail. Work out the handrail strip up to
the hull edge of the bulwark. Fit the gallows and
glue them.
Fig. net gallows and roller blocks
Attach the two roller blocks to the bulwark.
Make the two shear boards from parts 4.17 to
4.21.
4.17
4.18
Fig. shear boards
Stain the wooden parts before gluing them to-
gether so that no light stains are caused by glue.
After the glue has dried, the shearing boards can
be primed and varnished.
Then apply the bands 4.19. This can be done with
superglue or Stabilit Express and riveted with nails
part 7.20.
Bend the 4 hanger brackets from brass wire 4.20
according to drawing Y and fix them with split pins
part 4.21 to the upper laser cut reinforcement
frame.
Stand Mai 2019
M
T
.com
4.17
4.18
4.19
Seite 15
Fig. shear boards with fittings
Fig. shear boards with fittings and hangers
When attaching the hangers, make sure that the
two sheari boards are mirror-inverted.
Fabricate the retaining brackets for the shear
boards from 1 mm brass wire part 4.20 according
to drawing Y. Mount the bearings 4.21 on the trawl
board according to the drawing and hook the
brackets in.
Stage 5, Net Winch, Part 5.1 to 5.39
First glue the parts 5.1 and 5.2 together to form
the base.
5.2
5.1
Fig. part for base
Glue together the winch housing from parts 5.3 to
5.8 (see figure S).
5.3
5.8
5.6
5.3
Fig. parts of winch housing
Glue two 5.3 adapters onto the front wall of the
winch housing 5.4 and the rear wall 5.5 in such a
©
Krick Modelltechnik Knittlingen
4.21
4.20
5.2
5.5
5.7
5.8
5.3
5.4

Publicité

loading

Ce manuel est également adapté pour:

Ro1110