Télécharger Imprimer la page

Venmar CHEF VCQLA1 Serie Manuel D'installation, D'utilisation Et D'entretien page 20

Publicité

Les langues disponibles

Les langues disponibles

Connect the Wiring
1 ] Connect House Power Cable to range hood wiring: BLACK to BLACK, WHITE to WHITE and
2 ] Reinstall the blower cover plate (shaded part on illustration above) using the lock nut
Install the Filters
Ducted Installation Only:
Re-install grease filters removed in step 3 , page 10, under "Prepare the Hood" .
Non-ducted Installation Only:
Purchase two non-ducted filters from your local distributor or retailer (see product specification
label for filter type). Attach the non-ducted filters following instructions packed with the
non-ducted filters.
20
Risk of electric shock. Electrical wiring must be done by qualifi ed
personnel in accordance with all applicable codes and standards.
Before connecting wires, switch power off at service panel and lock
service disconnecting means to prevent power from being switched
on accidentally.
GREEN or bare wire under GREEN ground screw.
and 7 screws previously removed in step 4 on page 10. Pay attention to screw 1 location;
from back of hood point of view, it must be located on left side of the lock nut (see inset).
!
WARNING
HOUSE
POWER CABLE
5
6
1
7
BACK OF HOOD
LOCK NUT
MOTORS
GROUND
WIRE
GROUND
SCREW
4
3
2
1

Publicité

loading