Télécharger Imprimer la page

Vitavia VM0018-E 3100 Notice De Montage page 7

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 10
bolts in (2240) and (2241) to slide into the
open hole in corner angle (2215 / 2216) (4.7).
Note: Position (2240) and (2241) using the
locating edge on (2215 / 2216).
Place pane D into the guide in horizontal bar
(2237) and assemble onto (2240) and (2241)
(4.8) ensuring correct fitting into (2248) and
(2249)
.
5. ROOF ASSEMBLY
[VM0018-E 6000 & 7500:
Assemble parts (2320) / (2321) together using
connecter (2229) and 8 nuts and bolts (5.1).
Note: The 4 inside nuts and bolts should only
be connected loosely.
Slide part (2228) (5.2) over the join between
the ridge bars.]
Connect the assembled ridge bar (2320 -
2326) onto roof corner bars (2240) and (2241)
by sliding the prepared extra bolts into the
open hole in the ridge bar (5.3).
Insert 1 extra bolt to connect roof brace (1056)
into each roof middle bar (2242) (5.7) and
(2243) (5.8).
On two adjacent roof bars insert 1 extra bolt to
connect roof vent sill bar (2360) in step 6.
[VM0018-E 6000 & 7500: Please repeat this
at a second location.]
[VM0018-E 3100: Include 1 extra bolt adjacent
to that included in (2240) / (2241) in step 3.]
Connect roof middle bars (2242) and (2243)
between the eave angle bars, noting the
locating edge (5.4), (5.5) (5.6) and the ridge
bar (5.7) (5.8).
Now position your frame on the prepared
base/foundation and connect loosely. (Please
only tighten these bolts after the house is fully
glazed.) Adjust the frame until it is completely
square and tighten all bolts.
Please do not over tighten (max. 3Nm).
6. SIDE / ROOF GLAzING
[VM0018-E 6000 & 7500: Slide eave
connecter (2219) into the joining ends of eave
bars (2310) or (2311) (6.2). On both sides of
(2219) connect screw (1006) in the prepared
holes (6.2).]
Slide panes E into the appropriate guides in
the vertical bars (6.4).
Slide panes F and G into the appropriate
guides in the roof bars (6.5).
Prepare 4 bolts in each eave bar and connect
to eave angles (2315) or (2316) (6.6) (6.7).
Connect roof vent fixers (6056) to sill bar
(2360) using screws (1006) (6.8). Connect
(2360) in the desired opening for the roof vent
fitting it over the top edge of the assembled
pane G (6.9).
021.01.2007
Push spacer (2399) onto the ridge bar, in the
middle of each field, to ensure roof panes F
maintain the correct distance.
7A. SwING DOOR
Assemble (2252), (2253), (2254) and (2256)
as shown (7A.2) (7A.3) (7A.4).
Slide the panes H into the appropriate guides
in the middle bars and connect door side bar
(2258) (7A.5).
Slide brush seal (2270) into both side bars
(2252) and (2258) (7A.3). Slide bolts (1500)
into the bottom of the bolt channel holding
brush seals (2270) and fix it in place using nut
(1515) (7A.3). Cut the door seals (2270) to
length.
Please decide to which side the door should
open at this point. Follow details „R" when
latch will be on the right and details „L" when
the latch is on the left.
Cutting brush seal (2270) on the desired side,
use spring (2287) and screw (2288) to connect
door knob (2285) and door latch (2286) as
shown (7A.6).
Insert hinge sheath (2272) into the both ends
of door side bars (2252) or (2258) (7A.7).
Insert the hinge pin of hinges (2275) R or
(2273) L into the sheath at the top of the side
bars (7A.7).
Insert the hinge pin of hinges (2276) R or
(2274) L into the sheath at the bottom of the
side bars (7A.7).
Connect the hinges to the required side of
parts (2209) and (2237) using the prepared
holes, nuts (1002) and bolts (1001) (7A.8).
When the door is closed, the latch (2286)
will close around the side bars (2235) - R or
(2236) - L.
7B. SLIDING DOOR
Attention: Do not stand the assembled door
on door gliders (2214) to avoid damaging
them.
Screw (1006) into both sides of door bottom
bar (2255) and then push door gliders (2214)
into both ends (7B.2).
Assemble (2252), (2253), (2254) and (2255)
as shown (7B.3) (7B.4) (7B.5).
Slide the panes H into the appropriate guides
in the middle bars and connect door side bar
(2258) (7B.6).
Insert door guides (2271) into the top end of
door side bars (2252) and (2258) (7B.5).
Slide brush seal (2270) into both side bars
(2252) and (2258) (7B.7). Slide bolts (1500)
into the bottom of the bolt channel holding
brush seals (2270) and fix it in place using nut
(1515) (7B.7). Cut the door seals (2270) to
length.
Cutting brush seal (2270) on the desired side,
use screw (2289) to connect door knob (2285)
as shown.
Connect door guide bar (2251) to horizontal
bar (2237) loosely from the outside with two
nuts and bolts (7B.9).
Depending on which direction the door should
open, align the door guide bar (2251) to the
left or to the right.
Slide (2214) onto sill bar (2209) and (2271)
into door guide bar (2251) as shown.
Connect (2257) to door support bar (2250)
using bolt (2001). Connect (2257) to the end
of (2251) by inserting bolt (1001) in the bolt
channel in (2251) (7B.10).
Connect the bottom end of (2250) to corner
bar (2230) by inserting bolt (2001) into the bolt
channel in (2230) (7B.11).
Once the door is in place connect nut (1002)
and bolt (2001) into the open end of (2251) as
door stopper (7B.12).
8. ROOF VENT
Connect roof vent bars (2262) and (2361)
(8.2).
Slide pane J into the appropriate guides (8.3)
and connect bottom bar (2363) (8.4).
Attach roof vent opener (1067) using screws
(1006) and place plastic cap (1019) over the
end (8.5).
Position the roof vent in the ridge bar from one
end (8.6) (8.7) (8.8) and slide it to the
prepared opening (8.9).
FINISHING
If desired, it is possible to seal the greenhouse
at the edges using neutral silicone. Silicone is
not in cluded.
Place the warning label inside the house.
A full range of accessories is available to help
you make the most of this product. Please
contact your local stockist for details.
SAFETY NOTICE
In the event of high winds, close all doors and
vents.
In the event of heavy snowfall, clear the roof
of the building or take suitable measures to
support the roof. Heat the building in winter.
COMMENTS
For the complete protection of your new
greenhouse, we advise you to include it in
your house insurance. Please take note of
possible building rules relating to the
positioning of greenhouses.
Please stick the greenhouse model label
provided onto the door bar (2253) after
successfully assembling this product. This
information is important in the event that
replacement parts are later required.
Please keep these Assembly Instructions in
a safe place, for future reference!
Our policy is one of continuous improvement
and we reserve the right to change the
specifications without prior notice.
7

Publicité

loading

Ce manuel est également adapté pour:

Vm0018-e 4600Vm0018-e 6000Vm0018-e 7500