Télécharger Imprimer la page

Yamaha YZ125/LC Manuel D'atelier Du Proprietaire page 120

Masquer les pouces Voir aussi pour YZ125/LC:

Publicité

1 Cable guide
2 Radiator breather hose
3 Ignition coil
4 CDI magneto lead
5 Clutch cable
6 CDI unit band
7 CDI unit
8 Wireharness
9 High tension cord
0 Clamp
q CDI unit bracket
CABLE ROUTING DIAGRAM
A Pass the cluch cable into
the cable guide.
B Insert the ignition coil lead into
the ignition coil so that the lead
faces to the right of the frame.
C Pass the clutch cable over
the radiator hose.
D Pass the wireharness between
the convexites of the CDI unit
band.
E Clamp the high tension cord on
the upper part of the frame
gusset at its protecting tube.
F Pass the radiator breather hose
at the rear of the radiator hose
and in front of the ignition coil
bracket.
2-15
SPEC
G Push in the radiator hose until
its end lightly touches the radia-
tor pipe.
H Cut the clamp end to be flush
with CDI unit side.
I Fit the CDI unit band over
the CDI unit bracket till it
stops.
J Clamp the wireharness on the
CDI unit with the clamp ends
upward.

Publicité

loading

Ce manuel est également adapté pour:

Yz125s/lc