Télécharger Imprimer la page

Kohler K-8501 Guide D'installation page 4

Publicité

Les langues disponibles

Les langues disponibles

2. Installation Checkout
Complete the installation of the valve, valve trim and any other
components according to the instructions packed with the
product.
Ensure all connections are tight.
Open the drain.
Turn on the main water supply and check for leaks. Repair as
needed.
Open both hot and cold valves and run water through the spout
(if installed) to remove debris. Check for leaks.
Check the handshower for smooth operation.
Turn the valves to the closed position.
1016116-2-C
All manuals and user guides at all-guides.com
Handshower
Head
Outer
Ring
4
Kohler Co.

Publicité

loading

Ce manuel est également adapté pour:

K-8502K-8543K-8503K-16161K-16162K-16163