Télécharger Imprimer la page

Dell PowerEdge C6145 Guide De Mise En Route page 6

Masquer les pouces Voir aussi pour PowerEdge C6145:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32
All manuals and user guides at all-guides.com
1
Pull on the latch release buttons on the end piece midpoints to open
the rail latches.
2
Align the end pieces of the rails on the vertical rack flanges to seat
the pegs in the bottom hole of the first U and the top hole of the
second U. Engage the back end of the rails until the latches lock in
place.
NOTE: The rails can be used in both square-hole (item 1 in the following figure)
and round-hole racks (item 2 in the following figure).
3
Repeat Step 1 and Step 2 to position and seat the front end pieces on
the vertical flanges.
NOTE: To remove the rails, pull on the latch release button on the end piece
midpoint and unseat each rail.
4
On each vertical rack flange on the rear, put two screw bases into the
two square holes right above the rail.
5
Install the chassis stabilizer shipping brackets (optional) on the rear
rack flanges and simultaneously fasten the screws.
NOTE: To transport systems already installed in the rack, ensure that the two
chassis stabilizer shipping brackets (optional) are in place.
Getting Started With Your System
|
6

Publicité

loading

Ce manuel est également adapté pour:

B05s